Tubería Laguna Tubería Laguna

Multimedia

Manufacturing of large pipe diameters

Manufacturing process of steel pipe from 6 “to 24”

Smaller pipe diameters

Manufacturing process of steel pipe from 2 “to 6”

External coatings process

Process of applying FBE, 3LPP and 3LPE external coatings.

Product finishing processes.

Threading, bridge slot & vertical slot processes.

Quality Control tests

Tension, Charpy toughness, grain size, chemical tests.

Pipe stock yard

More than 50,000 tonnes available for immediate delivery

Shipping Process

Forklifts, Pettibones, and Shuttlelift.